CLIENT:

Marathon Petroleum

PROJECT TYPE:

Laboratory Renovation

SERVICES PROVIDED:

Architectural
Mechanical
Electrical
Construction Administration

LOCATION:

Catlettsburg, Kentucky

SIZE:

RAD Laboratories 4,000 SF
Control Laboratories 10,000 SF

Marathon Petroleum Laboratory Upgrades

PEDCO Marathon Petroleum Company was interested in improving the heating, ventilation, air conditioning (HVAC) and electrical systems serving its Refining Analysis and Development (RAD) and Control Laboratories at its Catlettsburg Refining facility in Catlettsburg, Kentucky. The laboratory buildings needed to be divided into chemical and fire control areas and PEDCO designed modifications to the existing walls to create the two 1-hour rated control areas needed in the building. The exhaust system serving the RAD laboratories was redesigned to provide Marathon full redundancy with a manifolded exhaust system to meet reliability goals of the project. PEDCO’s design resulted in a coordinated HVAC and exhaust system that met static pressure requirements as well as appropriate heating and cooling to maintain desired temperature in the labs. PEDCO also developed a phased approach for replacing existing electric panels within the labs to provide needed flexibility with power requirements without causing major disruptions during construction.