IU Health Goshen Hospital Operating Room

Goshen Hybrid OR Full Room View
Goshen Hybrid OR Full Room View
Goshen Hybrid OR TV Equipment
Goshen Hybrid OR Equipment
Goshen Hybrid OR Machines
Goshen Hybrid OR Tech Room

IU Goshen Hospital Operating Room

PEDCO provided engineering design services for a 1,500 SF existing Operation Room (OR) remodel which included a new imaging system, control room, surgical area, and system equipment room.  Power distribution upgrades included a UPS system for uninterruptable power for the sensitive imaging equipment.  The cooling upgrades provided additional capacity for the large amount of medical equipment in the new OR suite.

The medical equipment involved included: radiation shields on boom, 56” flat screen imaging monitor on boom, 3 smaller monitors on boom, cardiac mapping system, Siemens Artis Zeego (multi-axis robotic 3D imaging system and device guidance), LED surgical lighting on boom, and Mac-Lab hemodynamic recording system.  Because of the vast amount of equipment that was going into the new OR suite, PEDCO had to work closely with the hospital to coordinate the installation and integration of the equipment.

CLIENT

Indiana University Goshen Health System

PROJECT TYPE

Operating Room Renovation

DATE

Start: April 2011
End: December 2011

SERVICES PROVIDED

Mechanical Engineering
Electrical Engineering
Plumbing
Construction Administration

LOCATION

Goshen, Indiana

SIZE

1,500 SF